List of power stations in Illinois Article

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Illinois Electricity Generation Sources [1]
Power generating stations in Illinois by type.

This is a list of electricity-generating power stations in Illinois.

Nuclear power

Name Location Coordinates Nameplate
capacity ( MW)
Generating
units
2016 net generation
( MWh)
Reactor type Owner Opened
Braidwood Nuclear Generating Station Braidwood, Will County 41°14′38″N 88°13′44″W / 41.244°N 88.229°W / 41.244; -88.229 2,389 2 19,849,269 [2] Pressurized water Exelon 1988 [3]
Byron Nuclear Generating Station Ogle County 42°04′26″N 89°16′55″W / 42.074°N 89.282°W / 42.074; -89.282 2,347 2 19,600,248 [2] Pressurized water Exelon 1985, 1987 [4]
Clinton Nuclear Generating Station Clinton, De Witt County 40°10′19″N 88°50′06″W / 40.172°N 88.835°W / 40.172; -88.835 1,069 1 8,914,453 [2] Boiling water AmerGen
(Exelon subsidiary)
1987 [5]
Dresden Nuclear Power Plant Morris, Grundy County 41°23′20″N 88°16′08″W / 41.389°N 88.269°W / 41.389; -88.269 1,845 2 15,443,893 [2] Boiling water Exelon 1970, 1971 [6]
LaSalle County Nuclear Generating Station LaSalle County 41°14′42″N 88°40′08″W / 41.245°N 88.669°W / 41.245; -88.669 2,320 2 19,144,080 [2] Boiling water Exelon 1982, 1984 [7]
Quad Cities Nuclear Generating Station Cordova 41°43′34″N 90°18′36″W / 41.726°N 90.310°W / 41.726; -90.310 1,871 2 15,655,095 [2] Boiling water Exelon 1973 [8]

Wind

Name Location Nameplate
capacity ( MW)
Turbines 2016 net generation
( MWh)
Operator Opened
AgriWind Project Tiskilwa 8.4 4 5,891 [2] Exelon 2008 [9]
Mendota Hills Wind Farm Paw Paw 52 82,357 [2] Leeward Renewable Energy 2003 [10]
Shady Oaks Compton 110 71 323,948 [2] Liberty Power 2012 [11]
Bishop Hill I Henry County 211 601,090 [2] Invenergy 2012 [12]
Bishop Hill II Henry County 81 50 282,278 [2] Invenergy 2012 [12]
Bishop Hill III Henry County 132 53 Invenergy 2018 [13]
Brown County Wind Turbine Brown County 1.5 1 2,983 [2] Adams Electric Cooperative 2014 [14]
Minonk Wind Farm Minonk 200 100 636,089 [2] Liberty Power 2012 [15]
Crescent Ridge Wind Farm Bureau County 54 146,775 [2] Leeward Renewable Energy 2005 [10]
GSG Wind Farm Compton 80 198,797 [2] Infigen Energy 2007
Camp Grove Wind Farm Camp Grove 150 100 405,676 [2] Orion Renewables 2007 [16]
California Ridge Champaign County 217 732,885 [2] Invenergy 2012 [12]
Twin Groves Wind Farm McLean County 198 120 EDP Renewables North America 2007 [17]
Twin Groves Wind Farm II McLean County 198 120 EDP Renewables North America 2007 [17]
Geneseo Geneseo 3 2 6,574 [2] City of Geneseo 2009 [18]
Grand Ridge Wind Farm Marseilles 111 732,885 [2] Invenergy 2009
Pilot Hill Kankakee County, Iroquois County 175 573,434 [2] EDF Energy 2015 [19]
Kelly Creek Kankakee County, Ford County 184 92 82,646 [2] EDF Energy 2016 [20]
Providence Heights Wind Farm Bureau County 72 36 169,679 [2] Iberdrola Renewables 2008 [21]
EcoGrove Wind Farm Stephenson County 100 67 250,936 [2] Acciona 2009 [22]
Heartland Community College Normal 1.65 1 4,741 [2] Heartland Community College 2012 [23]
Pike County Wind Power Pike County 1.65 1 3,216 [2] Illinois Rural Electric Cooperative 2005 [24]
Rail Splitter Wind Farm Logan County, Tazewell County 100 67 280,646 [2] EDP Renewables North America 2009 [25]
Lee-Dekalb Wind Energy Center Lee County, DeKalb County 217 NextEra Energy Resources 2009
Radford’s Run Wind Farm Macon County 306 139 E.ON 2018 [26]
Streator Cayuga Ridge South Wind Farm Livingston County 300 150 752,101 [2] Iberdrola Renewables 2010 [27]
Top Crop I Grundy County, LaSalle County 102 68 263,021 [2] EDP Renewables North America 2009 [28]
Top Crop II Grundy County, LaSalle County 198 132 489,941 [2] EDP Renewables North America 2009 [28]
White Oak Wind Farm McLean County 150 423,580 [2] NextEra Energy Resources 2011 [12]
Big Sky Wind Farm Bureau County, Lee County 240 114 522,333 [2] EverPower 2011 [29]
Green River Whiteside County, Lee County 140 Geronimo Energy [30]
Pioneer Trail Wind Farm Ford County, Iroquois County 150 94 429,410 [2] E.ON 2011 [31]
Settlers Trail Wind Farm Iroquois County 150 94 380,904 [2] E.ON 2013 [32]

Coal

Name Location Coordinates Nameplate
capacity ( MW)
Generating
units
2016 net generation
( MWh)
2016 GHG emissions
(metric tons)
Owner Opened
Duck Creek Power Station Canton 40°27′54″N 89°59′02″W / 40.465°N 89.984°W / 40.465; -89.984 441 1 2,101,065 [2] 2,245,296 [33] Dynegy
Powerton Station Pekin 40°32′28″N 89°40′48″W / 40.541°N 89.680°W / 40.541; -89.680 1,538 1 4,541,832 [2] 5,289,941 [34] NRG Energy 1972, 1975 [35]
Waukegan Station Waukegan 42°22′55″N 87°48′50″W / 42.382°N 87.814°W / 42.382; -87.814 689 (coal/petroleum) 2 1,750,590 [2] 1,824,644 [36] NRG Energy
Will County Station Romeoville 41°37′59″N 88°03′43″W / 41.633°N 88.062°W / 41.633; -88.062 510 3 2,105,377 [2] 2,215,838 [37] NRG Energy 1963 [38]
Coffeen Power Station Montgomery County 39°03′33″N 89°24′11″W / 39.05917°N 89.40306°W / 39.05917; -89.40306 900 1 4,600,295 [2] 4,652,536 [39] Dynegy 1965
Newton Power Plant Jasper County 38°56′13″N 88°16′34″W / 38.937°N 88.276°W / 38.937; -88.276 1,151 1 3,320,361 [2] 3,446,397 [40] Dynegy
Electric Energy Inc. - Joppa Generating Station Joppa 37°12′32″N 88°51′29″W / 37.209°N 88.858°W / 37.209; -88.858 1014 coal, 91.8 natural gas 8 Electric Energy, Inc - Dynegy
SIPC – Lake of Egypt Marion 37°22′23″N 88°34′23″W / 37.373°N 88.573°W / 37.373; -88.573 400 Electric Energy, Inc / Southern Illinois Power Cooperative
Midwest Electric – Joppa Joppa 164 3 Electric Energy, Inc / Dynegy
E.D. Edwards Plant Bartonville 40°35′45″N 89°39′46″W / 40.5957°N 89.6628°W / 40.5957; -89.6628 749 1 2,805,607 [2] 2,698,889 [41] Dynegy
Baldwin Generating Center Baldwin 38°12′14″N 89°51′18″W / 38.204°N 89.855°W / 38.204; -89.855 1,806 1 9,779,274 [2] 9,784,003 [42] Dynegy
Havana Havana 40°16′52″N 90°04′41″W / 40.281°N 90.078°W / 40.281; -90.078 690 2,347,827 [2] 2,898,822 [43] Dynegy
Hennepin Hennepin 41°18′11″N 89°18′54″W / 41.303°N 89.315°W / 41.303; -89.315 301 1,580,338 [44] Dynegy
Lake Springfield Springfield 39°45′18″N 89°36′07″W / 39.7551239°N 89.6019277°W / 39.7551239; -89.6019277 724 4 City Water, Light & Power 1968, 1972, 1978, 2009 [45]
Prairie State Energy Campus Marissa 38°16′40″N 89°40′4″W / 38.27778°N 89.66778°W / 38.27778; -89.66778 1,600 2 10,587,579 [2] 10,488,120 [46] Prairie State Energy Campus 2012 [47]

Natural gas

Plant Location Coordinates Nameplate
capacity ( MW)
Generating
units
2016 net generation
( MWh)
2016 GHG emissions
(metric tons)
Operator Opened
Joliet Station Joliet 41°29′42″N 88°07′26″W / 41.495°N 88.124°W / 41.495; -88.124 1,326 3 652,682 [2] 1,453,899 [48] NRG Energy [49]
Grand Tower Power Station Grand Tower, Jackson County 37°39′29″N 89°30′40″W / 37.658°N 89.511°W / 37.658; -89.511 523 6 413,769 [2] 195,267 [50] Rockland Capital [51]
Elgin Energy Center Elgin 42°00′00″N 88°14′38″W / 42.000°N 88.244°W / 42.000; -88.244 484 8 231,282 [2] Rockland Capital [52]
Gibson City Power Plant Gibson City 40°28′12″N 88°23′53″W / 40.470°N 88.398°W / 40.470; -88.398 228 4 113,401 [2] 75,005 [53] Rockland Capital [54]
Goose Creek Energy Center Piatt County 40°06′22″N 88°35′56″W / 40.106°N 88.599°W / 40.106; -88.599 432 6 27,657 [2] 19,977 [55] Ameren Illinois [56]
Rocky Road East Dundee 364 75,128 [2] Dynegy
Kendall County Generation Facility Minooka 41°28′48″N 88°15′22″W / 41.480°N 88.256°W / 41.480; -88.256 1,256 7,195,291 [2] 2,938,985 [57] Dynegy
Cordova Energy Gas Plant Cordova 690 3 45,910 [2] Cordova Energy Co LLC
Southeast Chicago Energy Project Chicago 352 8 39,778 [2] 31,070 [58] Exelon 2002 [59]

Solar photovoltaic

Name Location Type Nameplate
capacity ( MW)
2016 net generation
( MWh)
Acreage Operator Opened
Exelon City Solar Pullman, Chicago Crystalline silicon [60] 9 14,102 [2] 41 Exelon 2010 [61]
Geneseo Geneseo Crystalline silicon [60] 1.2 1,663 [2] 5 City of Geneseo 2015 [62]
Grand Ridge Solar Farm LaSalle County CIGS [60] 20 29,350 [2] Invenergy 2012 [12]
North Ninth Street Rochelle Crystalline silicon [60] 0.312 396 [2] Rochelle Municipal Utilities 2014 [63]
Rockford Solar Farm Rockford Crystalline silicon [60] 2.6 3,299 [2] Rockford Solar Partners 2012 [64]

Energy storage

Name Location Type Nameplate
capacity ( MW)
2016 net generation
( MWh)
Operator Opened
Grand Ridge Energy Storage Marseilles Lithium iron phosphate battery [65] 31.5 -5,076 [2] Invenergy 2015 [12]
McHenry Storage Project McHenry County Lithium-ion battery [66] 40 149,060 [2] EDF Energy 2015 [67]
Elwood Energy Storage Center West Chicago Lithium iron phosphate battery [68] 19.8 -3,964 [2] Renewable Energy Systems 2015 [68]
Jake Energy Storage Center Joliet Lithium iron phosphate battery [68] 19.8 -3,410 [2] Renewable Energy Systems 2015 [68]

Proposed power stations

Name Location Type Nameplate
capacity ( MW)
Generating
units
Operator Status
Blue Ridge Wind Farm Piatt County, McLean County, Champaign County Wind 200 44–63 Geronimo Energy Under construction [69]
Cardinal Point Wind McDonough County, Warren County Wind 150 Capital Power Corporation Expected operable March 2020 [70]
McLean County Wind Energy Center McLean County Wind 250 100 Invenergy Expected to begin construction in 2018 or 2019 [71]
Broadlands Douglas County Wind 200 58–75 EDP Renewables Expected operable by late 2019 [72]
Bright Stalk Wind Farm McLean County Wind 200 58 EDP Renewables Expected operable by 2022 [73]
McLean County Solar PV 6 Cypress Creek Renewables Application submitted [74]
Marshall County Solar PV 4 Trajectory Energy Partners Application submitted [75]
Macomb Solar PV 2 Sunrise Energy Ventures Construction expected to begin within 18 months [76]
Prairie State Solar Project Perry County Solar PV 99 Ranger Power Groundbreaking scheduled for late 2019 [77]
Mendota Hills Lee County Wind 76 29 Leeward Renewable Energy Turbine replacement scheduled for completion December 2018 [78]
HillTopper Logan County Wind 185 Enel Construction began April 2018 [79]
Walnut Ridge Bureau County Wind 212 91–132 Berkshire Hathaway Energy Expected operable 2018 [80]
Yorkville Solar PV 2 GRNE Solar Expected operable 2018 or 2019 [81]

Closed/Cancelled stations

Name Location Coordinates Type Nameplate
capacity ( MW)
Generating
units
Owner Links Status
FutureGen Morgan County 39°49′23″N 90°33′58″W / 39.82306°N 90.56611°W / 39.82306; -90.56611 Coal 229 Cancelled in 2015
Hutsonville Power Station Crawford County 39°8′2.4″N 87°39′36″W / 39.134000°N 87.66000°W / 39.134000; -87.66000 Coal 151 2 Ameren [1] Closed in 2011
Meredosia Power Station Morgan County 39°49′23″N 90°34′01″W / 39.823°N 90.567°W / 39.823; -90.567 Coal/petroleum 513 4 Ameren [2] Closed in 2011
Wood River Alton 38°51′50″N 90°08′02″W / 38.864°N 90.134°W / 38.864; -90.134 Coal/natural gas 594 Dynegy Closed in 2016
Zion Zion 42°26′46″N 87°48′10″W / 42.4460578°N 87.8027112°W / 42.4460578; -87.8027112 Nuclear 2080 2 Exelon Closed 1998 [82]

Notes

  1. ^ US Energy Information Administration, Electric Power Monthly, February 2017
  2. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az ba bb bc bd be bf bg bh bi "Form EIA-923 detailed data". US Energy Information Administration. 2016. Retrieved December 11, 2017.
  3. ^ "Braidwood Generating Station". Exelon. Retrieved January 3, 2018.
  4. ^ "Byron Generating Station". Exelon. Retrieved January 3, 2018.
  5. ^ "Clinton Power Station". Exelon. Retrieved January 3, 2018.
  6. ^ "Dresden Generating Station". Exelon. Retrieved January 3, 2018.
  7. ^ "LaSalle County Generating Station". Exelon. Retrieved January 3, 2018.
  8. ^ "Quad Cities Generating Station". Exelon. Retrieved January 3, 2018.
  9. ^ "AgriWind Project". Exelon. Retrieved January 3, 2018.
  10. ^ a b "Wind Asset Map". Leeward Renewable Energy. Retrieved March 12, 2018.
  11. ^ "Shady Oaks". Liberty Power. Retrieved January 10, 2018.
  12. ^ a b c d e f "Our Projects". Invenergy. Retrieved January 5, 2018.
  13. ^ "WEC Energy Group announces agreement to acquire 80 percent ownership in Bishop Hill III Wind Energy Center". PR Newswire. June 28, 2018. Retrieved July 11, 2018.
  14. ^ "Brown County Wind Turbine". Adams Electric Cooperative. Retrieved January 16, 2018.
  15. ^ "Minonk". Liberty Power. Retrieved January 10, 2018.
  16. ^ "Camp Grove Wind Farm". Orion Renewables. Retrieved January 16, 2018.
  17. ^ a b "Twin Groves Wind Farm" (PDF). EDP Renewables. Retrieved February 13, 2018.
  18. ^ "Wind Turbines". City of Geneseo. Retrieved January 17, 2018.
  19. ^ "Pilot Hill Wind". EDF Renewable Energy. Retrieved January 10, 2018.
  20. ^ "Kelly Creek Wind". EDF Renewable Energy. Retrieved January 11, 2018.
  21. ^ "Iberdrola Renewables invests $1.4 billion in wind power in the U.S. in first 9 months of 2008". Avangrid Renewables. December 3, 2008. Retrieved January 11, 2018.
  22. ^ "Ecogrove Wind Farm". ACCIONA. Retrieved January 16, 2018.
  23. ^ "Wind Turbine". Heartland Community College. Retrieved January 16, 2018.
  24. ^ "Pike County Wind Power" (PDF). Illinois Rural Electric Cooperative. Retrieved January 19, 2018.
  25. ^ "Rail Splitter Wind Farm". EDP Renewables. Retrieved January 11, 2018.
  26. ^ "E.on switches on 534 MW of wind in US, breaks ground on further 201 MW". Renewables Now. January 11, 2018. Retrieved January 24, 2018.
  27. ^ "Streator Cayuga Ridge South Wind Power Project". Avangrid Renewables. Retrieved January 11, 2018.
  28. ^ a b "Top Crop Wind Farm". EDP Renewables. Retrieved January 16, 2018.
  29. ^ "Big Sky Wind Farm, Bureau & Lee Counties, IL". EverPower Wind Holdings. Retrieved January 19, 2018.
  30. ^ "Project Map". Geronimo Energy. Retrieved June 5, 2018.
  31. ^ "Pioneer Trail Wind Farm". E.ON. Retrieved January 16, 2018.
  32. ^ "Runner up: Settler's Trail Wind Farm, owned by E-ON Climate and Renewables in Illinois". Power Engineering. Retrieved January 16, 2018.
  33. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  34. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  35. ^ "Powerton" (PDF). NRG Energy. Retrieved February 20, 2018.
  36. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  37. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  38. ^ "Will County" (PDF). NRG Energy. Retrieved February 20, 2018.
  39. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  40. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  41. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  42. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  43. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  44. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  45. ^ "Electric Generation". City Water, Light, and Power. Retrieved February 20, 2018.
  46. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved February 26, 2018.
  47. ^ "Ownership". Prairie State Energy Campus. Retrieved February 20, 2018.
  48. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  49. ^ "Joliet NRG Fact Sheet" (PDF). NRG Energy. Retrieved January 29, 2018.
  50. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  51. ^ "Grand Tower Energy Center". Rockland Capital. Retrieved January 29, 2018.
  52. ^ "Elgin Energy Center". Rockland Capital. Retrieved January 29, 2018.
  53. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  54. ^ "Gibson City Energy Center". Rockland Capital. Retrieved January 29, 2018.
  55. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  56. ^ "Amaren Corporate Fact Sheet" (PDF). Amaren. Retrieved May 30, 2018.
  57. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  58. ^ "GHG Facility Details". US Environmental Protection Agency. Retrieved March 7, 2018.
  59. ^ "Southeast Chicago Energy Project". Exelon. Retrieved January 4, 2018.
  60. ^ a b c d e "2016 Form EIA-860 Data - Schedule 3, 'Solar Technology Data' (Operable Units Only)". US Energy Information Administration. 2016. Retrieved February 14, 2018.
  61. ^ "Exelon City Solar". Exelon. Retrieved January 3, 2018.
  62. ^ "Geneseo celebrates Midwest's largest solar project". Moline Dispatch & Rock Island Argus. October 14, 2015. Retrieved January 5, 2018.
  63. ^ "RMU Announces Solar Plant Completion". Rochelle Municipal Utilities. November 7, 2014. Retrieved January 24, 2018.
  64. ^ "Rockford solar farm to go on line by month's end". RRStar.com. September 12, 2012. Retrieved February 14, 2018.
  65. ^ "Invenergy Announces Start Of Commercial Operation Of 31.5 MW Grand Rodge Energy Storage Project In Illinois". BYD. May 14, 2015. Retrieved January 23, 2018.
  66. ^ "McHenry, a first 20MW battery storage project in the USA". EDF Store & Forecast. March 25, 2016. Retrieved January 23, 2018.
  67. ^ "McHenry Storage Project". EDF Renewable Energy. Retrieved January 23, 2018.
  68. ^ a b c d "RES Americas Announces Largest Energy Storage Projects In North America". BYD. November 11, 2014. Retrieved January 23, 2018.
  69. ^ "Blue Ridge Wind". Geronimo Energy. Retrieved June 12, 2018.
  70. ^ "Cardinal Point Wind". Capital Power. Retrieved June 13, 2018.
  71. ^ "100 more wind turbines headed for Northern Illinois". Windpower Engineering & Development. January 3, 2018. Retrieved January 26, 2018.
  72. ^ "Texas company planning wind farm in Douglas County". The News-Gazette. June 23, 2017. Retrieved June 5, 2018.
  73. ^ "2nd wind farm proposed in northern McLean County". The Pentagraph. January 18, 2018. Retrieved January 26, 2018.
  74. ^ "Solar farms planned near Arrowsmith, Downs". The Pentagraph. January 20, 2018. Retrieved January 26, 2018.
  75. ^ "Marshall County sites eyed for solar projects". JournalStar. January 23, 2018. Retrieved January 29, 2018.
  76. ^ "City Sells Land to Become Future Solar Garden". Tri States Public Radio. January 23, 2018. Retrieved January 29, 2018.
  77. ^ "99 megawatts of solar in Illinois, 99 megawatts of solar…". PV Magazine. March 6, 2018. Retrieved March 6, 2018.
  78. ^ "Leeward partners with Siemens Gamesa to repower Illinois' Mendota Hills Wind Farm". Windpower Engineering & Development. March 6, 2018. Retrieved March 6, 2018.
  79. ^ "Enel to sell power from its first wind farm in U.S. State of Illinois to Bloomberg and General Motors". Enel. April 9, 2018. Retrieved April 9, 2018.
  80. ^ "About Us". BHE Renewables. Retrieved June 5, 2018.
  81. ^ "Kendall County Board OKs solar panels near jail in Yorkville". Kendall County Now. March 8, 2018. Retrieved October 1, 2018.
  82. ^ "Zion Station". Exelon. Retrieved December 29, 2017.

References